http://www.InstrumentationExchange.com
  • English
  • Spanish
  • Chinese

Machine Listing - 800 HP - 1250 HP

IEC 119377

  800 HP Cleaver Brooks Firetube Boiler. #2 Oil & Natural Gas YEAR 2007. Design Pressure 250 PSIG. Model CBLE200-800, built in 2007 with strict adherence to ASME Code; Section I. . Unit is a four-pass dryback design with 3500 square feet of fireside heating surface. The shell is insulated with two inches of compressed fiberglass and covered with a heavy gauge sheet steel casing. The fully modulating forced draft burner is integrally mounted, piped and wired on the boiler front allowing for ease of flame observation, set-up and maintenance. Valve trim, controls and auxiliary equipment include; • Low NOx Burner • Primary low water cut-off • Secondary low water cut-off with manual reset • Boiler valve trim including • Water column • Front and rear hinged doors • Pressure gauge • Boiler/Burner control center • Steam pressure limit switches • NEMA 4 & 12 electrical • TEFC High Efficiency Motors; blower, air compressor and oil pump. • Atomizing air compressor • Fuel pump and motor drive • NFPA-8501 Safety Code requirements • National Board and TSSA Registration (CRN) • FM and GE-GAP insurance • Shipping Weight: 61000 lbs